Felicia 136M — Landi LPG-conversion requirements
A conversion requires the actual recipient, injection hardware, manifolds, controls and equipment to match the specified application. Engine displacement alone does not establish fit.[1]
Recipient selection
Confirm the actual engine/controller, recipient equipment, shell and steering layout before applying a conversion arrangement. Neither a programme name nor a manufacturing-month field resolves production/VIN or component-revision limits.
Interfaces and application conditions
| Interface | Required selection |
|---|---|
| Gas delivery | Actual regulator, manifold/jet placement, line dimensions, gas-compatible material and pressure limits; source-scoped arrangement |
| Pressure reference | Correct manifold/regulator branches and relief routing; documented connections |
| Petrol-injector interruption | Actual connector, injector resistance, emulator hardware and changeover settings; no later-programme equality assumed |
| Electrical control | Controller, selector, protected power connections, sensors, software and physical mounting; actual pin/revision selection |
| Tank and rear installation | Actual tank, multivalve, attachment, protected feed route and recipient-specific installation/approval evidence |
Documented component selections
| Component role | Shared record | Fitment condition |
|---|---|---|
| LPG controller | L.I.S. controller | Written application selection; full stock/calibration Unconfirmed |
| Fuel selector | C97K selector | Written application selection; full harness/revision Unconfirmed |
| Injector emulator | Pitagora 160 selection | Landi application name; physical equality to AEB description Unconfirmed |
| Delivery hardware and connections | Application arrangement | Actual members, material, operating limits and installation selection Unconfirmed |
These are conversion selections. They do not identify original factory LPG parts or establish a completed installation on every matching road model.[1]
See also
References
- ↑1 ↑2 Landi S.r.l. Skoda Felicia 1.3 — MPI Siemens 5WP4, installation sheet dated 1 March 2001, pp. 1–6; recipient header, electrical diagram, named front-kit selections and component-location callouts 1–12. Recipient manufacture field: 08/98. Manufacturer-authored sheet preserved by Drypa. Publication and recipient dates are not production/VIN application ranges.